Switchable smart glass for architects. Function, detailing and services in one coordinated design.

An active pane should not be added after framing and electrical services are closed. This resource organises the information needed for concept design, quotation, multidisciplinary coordination and manufacturing approval.

  • 6 layersof design decisions
  • before manufacturefinal size and connection
  • one brieffor architecture and services
DGF switchable smart glass coordinated with an office partition
Real DGF material / not a rendering

Answer in brief

When should DGF join the project?

Ideally during concept or technical design, before framing is ordered, ceilings are closed and electrical routes are fixed. A plan, indicative dimensions, functional description and intended construction are enough for an initial consultation. Final manufacturing data are approved later.

Starting point

Specify the outcome, not only the phrase “smart glass”.

The phrase “smart glass” does not define technology, power-off state, laminate build-up, dimensions, safety, controls or package responsibility. A sound specification begins with the user scenario and complete-partition requirements.

DGF translates the function into active-area geometry, cable direction, power-supply location and control logic. The glass engineer, framing supplier, electrician and integrator remain responsible for their scopes; coordination must make every interface explicit.

Decision scope

Six layers of a sound specification.

This structure can be transferred into the specification, glazing schedule and coordination checklist.

01

01. Function and default state

Define users, sightlines, privacy events and the required state during power loss. State whether the entire pane or selected zones should frost.

02

02. Complete partition build-up

Separate the active function from safety, acoustic, thermal, solar-control and resistance requirements. Performance must be confirmed for the complete specified configuration.

03

03. Geometry and tolerances

Define final size, shape, holes, cut-outs, pane orientation, active area and inactive border. Manufacture starts only after approval.

04

04. Frame, edge and contact materials

Verify rebate depth, support, tolerances, drainage where relevant, sealant compatibility and concealment of the connection without compression.

05

05. Power and controls

Define an accessible power-supply location, cable route, circuit zoning, local controls and any integration signals. Electrical installation remains the responsibility of the qualified trade.

06

06. Handover, instructions and service

Require testing of both states, circuit labelling, cleaning guidance and identification of components accessible for diagnosis without dismantling finished interiors.

Decision matrix

Responsibility matrix across disciplines.

Responsibilities must be contractually confirmed for each project. This table is a typical coordination starting point.

DecisionLeadCoordinates withRequired confirmation
Function and sightlinesArchitect / clientDGF and userScenario for both states
Pane build-up and sizeGlazing designerDGF, frame, structureApproved manufacturing drawing
Framing and glazing detailSystem supplier / contractorArchitect and DGFEdge and connection detail
Power and routesElectrical designerDGF and ceiling contractorDiagram, protection and access
BMS and scenesControls integratorDGF, electrician, userSignal schedule and functional test

Sequence matters

Four project decision gates.

Each closes a different risk and reduces the cost of later changes.

  1. 01

    Concept

    Function, sightlines, power-off state, product route and indicative format.

  2. 02

    Coordination

    Partition build-up, frame, edge, cable, power supply, circuits and operation.

  3. 03

    Approval

    Final survey and manufacturing drawing with unambiguous pane orientation.

  4. 04

    Handover

    Electrical and functional test, circuit labels, user guidance and service access.

FAQ

Questions worth resolving before a decision.

What should be sent for an initial consultation?

Send a plan and section, indicative dimensions, visualisation or photo, intended frame construction and privacy scenario. If electrical services are already being designed, include the diagram or possible power-supply location.

Can one standard glass thickness be specified?

Not for every application. Build-up depends on format, support, loads, safety, installation and the other requirements of the complete partition. The active function does not replace engineering or correct glazing selection.

Can DGF work with the selected framing system?

Feasibility is confirmed after reviewing the section, space for glass and connection, tolerances and installation method. The system supplier or contractor should participate in detail approval.

Who carries out the electrical installation?

The scope is agreed per project, but connection to building services, protection and compliance with site requirements belong to the appropriately qualified electrical trade. DGF provides the data needed to coordinate the glass system.

A specific project

Send a plan, photo or indicative size. We will begin with function and identify the missing decisions.

Start a consultation

Project and quotation

Tell us about the space. We will respond with a clear next step.

Include indicative dimensions, room type and expected effect. You can also start with a photo or plan sent in your email reply.