Up to five independent zones
The number of zones follows function and pane proportions, not a catalogue maximum. Two well-justified zones often give better operation and calmer detailing than five arbitrary ones.
Zoned switchable smart glass
Independently controlled zones frost only the selected part of the glass. Daylight remains where it is useful and privacy appears exactly where it is needed.
DGF solution
DGF zoned switchable smart glass divides the active surface into independent zones. Keep the upper part clear, frost the lower part or create your own sequence without mechanical blinds or extra layers.
We align the zones with framing, furniture lines and the way the room is used. The technology strengthens the interior composition instead of creating an arbitrary pattern.
How the solution works
DGF Segment uses the same PDLC principle as Classic, but divides the active layer into independently powered zones. Each zone can be clear or frosted without changing the others. One pane can preserve a view at eye level while screening the lower area beside a desk or bed.
The layout is not created later in an app. Division lines, zone count and connection order are part of glass production, so they must match the final dimensions and architecture. The control interface mirrors the physical pane and combines its states into useful scenes.
Important: zones cannot be moved or added after the glass is manufactured. We first design real usage scenarios, then draw the zoning and release the pane for production.
The number of zones follows function and pane proportions, not a catalogue maximum. Two well-justified zones often give better operation and calmer detailing than five arbitrary ones.
Independence requires planned connections, a controller and labelled wiring. Documentation maps each zone to its channel so commissioning and later service remain clear.
Users do not need to switch zones one by one. A “consultation”, “presentation” or “evening” scene can set several zones to a programmed combination with one command.
The height of a worktop, handrail, window transom or furniture edge suggests natural divisions. Aligning these lines makes the technology read as an intentional architectural decision.
What you gain
The result is not defined by one parameter. It comes from the right pane, considered controls and installation detailing.
Each zone can switch state without frosting the whole pane.
Saved settings adapt the glass to meetings, focused work or rest.
Clear zones continue to admit daylight while the others provide privacy.
The number and proportions of zones follow the size, purpose and rhythm of the partition.
From concept to commissioning
We define the number, height and order of zones on the final pane size.
Each zone receives a controlled connection and a clear control logic.
We group zones into convenient scenes operated by a switch, remote or app.
Space and purpose
DGF Segment makes sense when users have different needs at different heights or parts of the glass. It is not decorative zoning; it is a tool for managing views.
Medical and treatment room
Lower partition zones can stay frosted during an examination while the upper area continues to share light and lets staff remain aware of the surroundings. Another scene can frost the whole pane. Heights follow equipment, patient position and circulation rather than a universal template.
Boardroom and executive office
A middle zone can block direct corridor views while the upper one preserves openness. During a confidential meeting one scene switches every zone. The layout needs coordination with table height, seated eye level, door frames and any presentation screen.
Residential window and bathroom
In a ground-floor bathroom or bedroom window the lower zone can maintain privacy while the upper area stays clear. At night the whole pane turns frosted. Before manufacture we assess the frame, moisture conditions, exterior lighting and routes for several controlled circuits.


A project, not a gadget
Control becomes intuitive when the app layout mirrors the physical zones. Users see exactly which part will change and can combine zones into everyday scenes.
View DGF projectsProduct specifications
Every pane is technically confirmed for its final dimensions and installation. The values below describe the base product configuration.
Ask about your dimensions| Number of zones | up to 5, depending on the project |
|---|---|
| Controls | independent or scene-based |
| Base glass | Opti White Pilkington, 4 mm |
| Layers | EVA 0.8 mm + PDLC layer 0.36 mm |
| Power | 48 V DC |
| Energy use | ~1 W/m² |
| Size and layout | made to project |
Informed selection
The most common mistake is drawing an impressive pattern without checking how it will be used. A good zoned design can be explained through a few simple scenes and remains intuitive even to a first-time user.
Who needs privacy, from which direction, at what height and for how long? The answers naturally define zone boundaries.
More zones give flexibility but also more channels and states. In practice we design the smallest number that supports the required scenes.
Division lines should correspond to frames, façade modules, furniture and views. Their position is confirmed on the final pane drawing.
An app makes scenes convenient, but a switch by the entrance may be fastest. Local and remote control should be defined with the user.
Solution family
Not every project needs the same configuration. Compare the core roles and confirm the details during consultation.
Knowledge before a decision
Zoning should follow human behaviour and control logic. These guides explain PDLC, channels, scenes and the office context.
Questions before a project
Pricing depends on dimensions, pane count, controls and installation. A few answers usually identify the right direction.
Yes. Zone proportions and order are defined by the project and confirmed before production.
Yes. Zones can work independently, in groups or as one saved scene.
Before ordering the glass. The active-layer zoning is part of pane production, so it is based on final dimensions.
No. Zoning is formed in the active layer and sealed into the laminated pane. Before production we approve a drawing with zone dimensions, cable exits and controller-channel assignments.
No. Zones can be controlled in an app, grouped into scenes or assigned to multifunction switches. Interface design should minimise daily actions while retaining the required control.
The active-layer division is a designed element and may be visible, especially when adjacent zones are in different states. Its exact position is shown on the drawing and aligned with frames and furniture.
The pane size, number and geometry of zones, independent channels, wiring, controller, scenes, installation and commissioning all matter. More complex zoning and control logic increase the design scope beyond the glass itself.
Not every layout is feasible. Zoning must account for the active-layer technology, minimum distances, cable exits, pane size and controls. Rather than promise any pattern, we prepare a manufacturable layout that remains clear in everyday use.
Unpowered zones return to the frosted state. The design should confirm whether that default is right for every zone and whether a specific function requires backup power.
Technical consultation
Project and quotation
Include indicative dimensions, room type and expected effect. You can also start with a photo or plan sent in your email reply.
Jasionka 954 Aeropolis