Full pane or zones?
DGF Classic switches the complete pane and suits a simple open–private scenario. DGF Segment can screen only eye level or create several scenes, but zoning must be defined before production.
Smart glass for architecture, business and home
Application / office
Clear in daily use and frosted for a conversation. An active pane organises corridor views, preserves the lightness of glazed architecture and gives users simple local control.

Application context
In a typical meeting room glazing is valuable for most of the day: it shares light, opens the corridor and shows whether the room is available. A client conversation, interview or confidential work creates the need to screen the view. Smart glass supports both situations without blinds or moving slats.
The frosted state obscures recognisable images, but it does not soundproof a conversation or create blackout. If the project requires acoustic privacy or screen-light control, those conditions are solved separately through the complete partition, seals, lighting and display position.
From function to detail
These decisions cannot safely wait until installation. Each affects manufacture and use.
DGF Classic switches the complete pane and suits a simple open–private scenario. DGF Segment can screen only eye level or create several scenes, but zoning must be defined before production.
Ideally by the entrance or presenter position, where a meeting naturally starts. An app can extend control but should not be the only method of everyday operation.
We assess sightlines, seated eye level, doors and adjacent workstations. The active area then answers a real need rather than an arbitrary composition.
The cable exits at the agreed edge, the power supply remains serviceable and the route does not conflict with doors, profiles or ceiling finishes.

Delivery process
We receive dimensions, partition sections, views and a description of room use.
We confirm panes, cable exits, power supplies, controls and trade responsibilities.
After installation we test both states, switch labelling, edge finish and service access.
Important before deciding
An active pane looks simple but requires early coordination between glazing, electrical work and the partition system.
Solution variant
Selection is confirmed after reviewing dimensions, construction, privacy extent, light and installation.
Prepare an enquiry
This information lets us assess the solution quickly, identify missing coordination and prepare an appropriate scope.
Send the brief to DGFExplore the topic
FAQ
Not through switching itself. Acoustic performance depends on the complete glazing build-up, profiles, doors, seals and building interfaces.
Yes. Each room can have a local switch, while agreed automation or SUPLA can group devices and scenes.
The PDLC layer returns to the frosted state. This default is considered in the room function and any backup-power design.
Sometimes, after checking the construction, dimensions, pane replacement and a safe power route. Retrofit feasibility is assessed from documentation or a site visit.
A similar project
Project and quotation
Include indicative dimensions, room type and expected effect. You can also start with a photo or plan sent in your email reply.
Jasionka 954 Aeropolis