Project / consultation / quotation
Tell us about the space. We will match the glass to its function, detail and installation.
Tell us what should change when the glass switches and what stage the project has reached. You do not need complete documentation—an initial description, indicative dimensions, a photo or plan are enough to begin.
Start the conversation
Choose a topic. The form will prepare the right starting point.
You do not need to know the product name. Describe the space and the result you need—we will select the glass after reviewing the context.
Required: name, email, subject and message.
We use your details only to handle this enquiry. If you have project files, mention them in the message and we will provide a way to share them.
After you send the message
Context first. Then the right solution.
A smart-glass quotation should not begin with a square-metre price alone. It starts with the function, construction and power strategy for the specific pane.
- 01
We review the context
We review room function, dimensions, sightlines, project stage and the information you already have.
- 02
We close the gaps
We identify missing decisions: pane build-up, cable, power supply, framing, controls or installation conditions.
- 03
We define the next step
You receive a clear recommendation: consultation, documentation update, sample review or quotation.
Digi Glass Factory
Jasionka—where project coordination begins.
We work from the first brief through pane and control selection to installation preparation. Project documents are best sent by email; short questions can be discussed by phone.
Jasionka 954 Aeropolis36-006 Jasionka Get directions in Google Maps
FAQ
Before sending your first enquiry.
Can I enquire without exact dimensions?
Yes. Indicative dimensions, a photo or plan and the intended effect are enough for an initial assessment. Final dimensions and cable-exit direction are confirmed before manufacture.
When is the best time to contact DGF?
Ideally before ordering frames and closing electrical services. This allows the glass, cable route, power supply and controls to be coordinated without costly changes.
What information speeds up a quotation?
Dimensions, pane quantity, a site photo, framing detail, preferred controls and project programme are most useful. If some information is unavailable, simply note that in the message.
Does the frosted state provide full blackout or sound insulation?
No. The active layer obscures recognisable images while still transmitting light. Acoustics depend on the complete partition, framing, doors and seals, so these requirements are reviewed separately.